Chargement...
Chargement...
Developer, builder, property dealer: operation P&L, tornado sensitivity, multi-tranche phasing, VEFA intrinsic/extrinsic GFA, CCAP/CCTP templates compliant law 08/04/2018.
From land to delivery, with execution tracking.
/pag-pap: PAG zones, buildability (COS/CMU × zone), road setback + green space. Public geoportail.lu geocoder. /convertisseur-surfaces to go from cadastral → buildable.
/bilan-promoteur: revenue × sales period × build cost × financial costs × VAT. Tornado chart ±10% sensitivity on 8 variables (sorted by amplitude). Multi-tranche phasing with 48-month Gantt.
/vefa: staggered funds calls, construction delay (0-24 month slider) and intercalary interest surcharge, intrinsic vs extrinsic GFA (insurer, 0.3-2% premium). /estimateur-construction: STATEC material indices + CSV export per trade for competitive bidding.
Feasibility → P&L → execution → sales pipeline.
Tornado ±10% on 8 variables, phased tranches, execution tracking.
Funds calls, construction delay, intrinsic/extrinsic GFA.
STATEC material indices, CSV export per trade.
CCAP/CCTP templates law 08/04/2018, 10 articles + DQE.
Buildable zones, COS/CMU, address search (geoportail).
Cadastral → buildable, PAG + road setback + green space.
CSV import of actual costs, month-by-month execution tracking, margin overrun alert.